Avoiding erosion problems in Buildings
by Ademola
(Adagba)
1. take proper levels to determine the final foundation height, e.g have a reference level to transfer so that your finished floor level will be higher than that of the surroundings
2. Properly study the flow of erosion, get the levels and design your drainage structure before any excavation for foundation.